Familiar Technologies: Bentonite spud mud, Calcium Carbonate polymer mud, KCl/PHPA polymer mud, Glycol mud system, Synthetic Oil based mud
Regions of the world you have worked: Africa(Nigeria)
Resume: Tosin Adenowo
Drilling/Completion fluids engineer
Career Objective
To use my knowledge and experience in discharging my duties promptly and effectively so as to ensure that the organization achieve her set goals.
Professional Experience
February 2007 – Present:
Lead Drilling/Completion Fluids Engineer
Arkleen Oil and Gas
41, Adesuwa road, G.R.A, Benin, Edo, Nigeria.
Company Industry: Oil/Petroleum
Job Role/Department: Engineering
-Contribute in the formulation, design and recommendation of drilling fluids programme
– Manage drilling fluids properties within specified limit, interpret drilling fluid test and also carry out drilling fluids treatment during drilling operations.
– Work closely with the mud loggers, well site geologist and company man for smooth drilling operations.
– Supervise all mud plant operations such as mixing, storage and bulking of drilling fluids/brine to the ship at Federal Ocean Terminal, Portharcourt.
– Conduct comprehensive drilling fluids laboratory test at least twice a day on the rig.
– Experienced in the optimal use of Solids Control Equipments systems
-Attending drilling meetings with client for company.
-Field representative of company at contractor sites.
-Train and mentor younger drilling fluids engineer
-Establish and carry out quality assurance and quality control measures(QAQC) to ensure that drilling fluids chemicals supplied by vendors meet required company’s specification
-Experienced in the writing of end of well recap.
-Assist in preparation of bid for bidding processes(Prequalification, Technical & Commercial)
-Gather, analyze and discuss daily/weekly/monthly drilling operations with the operations manager.
-Collaborate with the operations manager to create strategic plans to enhance customer satisfaction.
-Experienced in stock keeping and inventory of drilling fluids chemicals and other goods. Confirm condition and quantity of stock received.
I have also worked in all stages of drilling, from spudding, logging, casing, cementing to completion. I have been faced with challenges like gas kick, stuckpipe, lost circulation etc and they were well handled.
Mud Type: Bentonite spud mud, CaCO3/polymer mud, KCl/PHPA polymer mud, Glycol mud system, OBM and SOBM
Mud Weight: 8.3ppg – 15.8ppg
Brine Type: Calcium Chloride, Sodium Chloride, Potassium Chloride and Calcium Bromide
Wells i have worked on as drilling/ or completion fluids engineer; Adolo 3,4,5,6, Ona 4,5,6, Erinwindu 2,3,4, Ologbo 13,8, Ossiomo 7, Umutu 7, Owe 1
Companies i have worked with as drilling/completion fluids engineer; Total, PanOcean oil Corporation, Platform, OANDO
January 2006 – September 2006:
Geologist
Chevron Nigeria Limited
1, Chevron drive, Lekki, Lagos, Nigeria
Company Industry: Oil/Petroleum
Job Role/Department: Geology
-Well Log Interpretation for identification of different lithologies(sand-shale) and fluid(gas-oil-water).
-Generate well log correlation of reservoir sands from among different wells in the same oil field.
-Identification of critical seismic event using well-to-seismic ties.
-3D Seismic Structural and Stratigraghy Interpretation.
-Updating drilling reports and geological reports
Education
December 2006: Vimatech Drilling Fluids Engineering School
Certification, Drilling Fluids Engineering
August 2006: Geo Science Solution
Certification, Design, Acquisition and Processing of Seismic Surveys
July 2006: Network of Excellence in Training(NEXT)
Certification, Principles of 3D Seismic Interpretation
June 2006: Network of Excellence in Training(NEXT)
Certification, Seismic Stratigraphy Interpretation of 2D/3D
January 2006: Olabisi Onabanjo University, Ogun, Nigeria
Bachelor’s degree, Earth Sciences(geology)
QHSE Training
April 2006: Behaviour Based Safety(BBS)
Chevron Nigeria Limited
April 2006: STOP
Chevron Nigeria Limited
August 2010: Office Safety
Arkleen Oil and Gas
2007 – Present: Weekly Oil Rig HSE Training
KCA Deutag(Rig-76, Rig-57), DWC-20, Drill log 1 etc
Career Level
Career Level: Expert
Notice Period to Work: 2 weeks
Target Job
Target Job Location: Any Location
Target Industry: Engineering; Science; Oil/Petroleum
Employment Type: Employee
Employment Status: Full time/Contract
Skills
Microsoft office(word, excel, Power point, outlook)
Seiswork(land mark)
Stratworks(land mark)
Basic UNIX Applications
Languages
Language: English, Yoruba
Skill Level: Expert